Home > Inventory > Stock Control > Screen Shots/Explanations > COGS Average Periods

COGS Average Periods

To support the costing method Periodic Weighted Average Costing set up on the POS 1 tab within System Settings, periods can be created by selecting a Period Type (Daily, Weekly or Monthly) along with the Period Interval. For example, if the Period type is Daily and the Period Interval is 1, From Date of 01/07/2013, To Date of 31/07/2013, then the periods are created for each day as shown below:

Figure: Example Periods for COGS Average Calculation

In Schedule Jobs the procedure ‘COGS Periodic Average Calculation’ is used to calculate the COGS Periodic Average.

Converted from CHM to HTML with chm2web Pro 2.85 (unicode)